In the case of static analysis, most of the information is extracted from the model and used to analyze cost, time management, performance, process flow validity, and resource leveling.
在静态分析中,大多数信息是从模型中提取出来的,并用于分析消耗、时间管理、性能、流程有效性及资源水平。
The existing dynamic memory management methods are inefficient, and have high cost of time.
现有的动态存储分配算法存在着效率不高、时间开销较大等缺点。
As a management way in modern project management, the method of earned value analysis plays an important role in time management and cost management.
挣得值分析法作为现代项目管理的一种管理方法,在项目进度管理和费用管理中具有重要作用。
应用推荐